Mustang Project while owner serving in Iraq

This project has been on hold for awhile but it is time to finish it so we got it out of storage and into the fab shop. The first thing Brian did was line up the deck lid.

DSCN3522_zpsrdibee8k.jpg


He had to do a little cutting and welding on it and I did the bodywork and sprayed two coats of SPI epoxy.

DSCN3563_zpsb8id7xcz.jpg


Block sanded and sprayed SPI Turbo primer.

DSCN3574_zpszzmnec8b.jpg


The customer wanted vents in the hood and I found these. This is not his car.

DSCN3620_zpsbewwn8cn.jpg


After Brian did a lot of measuring he found out they would fit without modifying the brace.

DSCN3629_zpsfnlfek9i.jpg


He just had to trim a little of the flat part of the brace

DSCN3639_zpssecz7dj0.jpg



DSCN3636_zps7dvqy2f9.jpg
 
Back
Top