D
dcs13
Sprayed the bare metal with 2 coats of SPI epoxy. Laid some Evercoat Quantum, worked it with 80, and finished with 180. Had some bare metal, shot 2 more coats of SPI epoxy. looking at it today, I can see some of the filler. Is the filler "absorbing the epoxy and I just should have sprayed it heavier in these areas? looks great elsewhere. Temp was upper 60's for over 24 hours. newb here, thanks