Epoxy Primer Drying Time

JimKueneman

Mopar Nut
Reading through the data sheets and "Perfect Paint Job" paper. It appear that it is ok to spray Epoxy and base coat in the same day. I plan to spray epoxy in the morning then mix up the base coat/Universal Clear "single stage" and spray that in the afternoon. This is just for underbody and interior areas that are normally not seen.
 
Do you mean epoxy used as a sealer? Then I'd say yes, it is ok to do that. I used epoxy mixed as a sealer and sprayed base 2 hours later and followed up with clear about 12 hours later.
That was with a surface temperature of approximately 70 degrees.

Mike
 
Same day is if you mix the epoxy as a sealer. If mixed unreduced then wait overnight.
 
Back
Top