poor adhesion

  1. V

    Glazing putty over 2k high build

    I'm working on a hood I have my filler as base then epoxy then 2k high build now I am glazing lows in my hood, what I am finding out is I am having to use alot more glazing putty than I intended on to get the hood straight, I am using pro glaze which has in the material sheet that it can be used...
  2. B

    poor adhesion spraying base next day

    Hi Guys, I sprayed some epoxy as a sealer, then the next day sprayed nason base the next day. This was the inside of some doors. About a month later I taped the inside of the doors off to not get overspray on them, but pulling the tape up pulled the clear and base right off of the epoxy. Is...
Back
Top