T
Tiggie
Got two coats of epoxy on Monday evening. Going to seam seal tonight, and a little bit of filler and want to put one more epoxy coat over it.
1.) Do I need to scuff before filler (48 hours after spraying)
2.) Do I need to scuff before epoxy recoat if I wait until Saturday (five days)?
It's hot in the garage - around 70 at night/90 in the day.
1.) Do I need to scuff before filler (48 hours after spraying)
2.) Do I need to scuff before epoxy recoat if I wait until Saturday (five days)?
It's hot in the garage - around 70 at night/90 in the day.