T
teq56
confused about regular 2k flash time. Perfect paint job says 30 mins. Tech sheet say 3-5 mins depending on temps. Tech sheet also says pot life is 45-60 mins.
I can wait 30mins but need to be careful not to mix more than 2 coats worth of paint due to pot life. I can mix what I need as I go along coat by coat but just want to be sure. Maybe tech sheet needs to be corrected or I mis-read something?
I would rather ask the dumb ? now than sand it off and repaint later.
Teq
I can wait 30mins but need to be careful not to mix more than 2 coats worth of paint due to pot life. I can mix what I need as I go along coat by coat but just want to be sure. Maybe tech sheet needs to be corrected or I mis-read something?
I would rather ask the dumb ? now than sand it off and repaint later.
Teq