Chris_Hamilton
Trying to be the best me, I can be
I searched and couldn't find a definitive answer. Question is how long would the minimum recoat time be with 2K, one coat of epoxy, 1:1, no sun, temperatures of 70 degrees. Only single coated as I just had small sand throughs to metal. I'm thinking 12-16 hours but not sure. Thanks.